2018 Good Quality Bulldozer Track Link Assembly - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth
2018 Good Quality Bulldozer Track Link Assembly - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth Detail:
Basic information
Part Name | Dozer link assy |
Model/Parts no. | D85ESS-2 |
Working environment | Mining/quarry/rocky/construction/earthmoving/sand |
Warranty: | 6 month or 1200 working hours |
Material | 35MnB |
Surface hardness | 50-56HRC |
Surface hardening | 6mm(standard 4-8mm) |
Heat treatment | Full enough |
Colour | Black or yellow |
Delivery time | 30 days |
Packing | Seaworthy fumigate pallet |
MOQ | 2pcs |
Technical drawing | Supply when order established |
Technical drawing
Analyze component | |||
The track link has been done special hardening treatment which ensures its high strength and excellent abrasion resistance&inductive harden surface | The bushing shaft has been carburized and quenched the surface with medium frequency,which guarantees its reasonable hardness of core and abrasion resistance of the inner and outer surfaces. | The pin shaft is quenched the surface with medium frequency after quenching and tempering,which ensures its sufficient core strength and wear-resistance of inner and outer surfaces. | Lubricated track link assemblies subassemblies,such as oil seals,are made from world well-known brands.high-quality oil seals guarantee the maximum longevity of lubricated track link assemblies. |
Model list
EXCAVATOR | ||||||||
Model |
Pitch (mm) |
Bolt hole (mm) |
Model |
Pitch |
Bolt hole |
Model |
Pitch (mm) | Bolt hole (mm) |
E70B | 135 | PC15 | 101 | SK015 | 90 | |||
E110B | 171 | 16.5 | PC20/PC30 | 101.6 | SK40 | 135 | ||
E320 | 190 | 20.5 | PC40-7 | 135 | 12.5 | SK100 | 171 | 16.5 |
E325 | 203 | 20.5 | PC60-5 | 135 | 12.5 | SK120 | 171 | 16.5 |
E330 | 216 | 22.5 | PC60-6 | 154 | 14.5 | K907 | 175.4 | 18.5 |
E345 | 216 | 22.5 | PC100-1 | 154 | 14.5 | SK200 | 190 | 20.5 |
E350 | 228.6 | PC100-5 | 175 | 16.5 | SK300 | 203 | 20.5 | |
EX15 | 90 | PC200 | 190 | 18.5 | SK450 | 228.6 | 24.5 | |
EX30 | 101 | PC200-5 | 190 | 20.5 | SH40 | 135 | ||
EX60 | 154 | 14.5 | PC300-1 | 203 | 22.5 | SH100 | 171 | |
EX70 | 154 | 14.5 | PC300-6 | 216 | 22.5 | SH180 | 175 | |
EX100/EX120 | 171 | 16.5 | PC400-1 | 216 | 22.5 | SH200 | 190 | |
FH150 | 171 | 16.5 | PC400-5 | 216 | 24.5 | SH450 | 228 | 24.5 |
EX200 | 175.4 | 18.5 | PC400-6 | 228 | 24.5 | R55/R60 | 135 | 12.5 |
FH220 | 190 | 18.5 | PC650-8 | 228 | 24.5 | R200 | 171 | 16.5 |
EX300 | 203 | 20.5 | VIO30 | 101 | FL4 | 140 | 12.3 | |
EX700/ZX870 | 260 | 27.5 | VIO050 | 135 | FL6 | 160 | 14.5 | |
BULLDOZER | ||||||||
D3B/D3C | 155.6 | 14.5 | D20 | 135 | 12.5 | |||
D4/D4D/D4E | 171.5 | 16.5 | D30/D31 | 154 | 14.5 | |||
D4H/D5C/D5G | 171 | 16.5 | D41P-6 | 171.5 | 16.5 | |||
D5/D5B | 175 | 16.5 | D50/D51EX-22 | 175 | 16.5 | |||
D6M/D6N/D5H | 190 | D65/D65EX-12/D65-8 | 203 | 20.5 | ||||
D6D/D6R/D6H | 203 | 19.5 | D80/D85/D85ESS-2 | 216 | 20.5 | |||
D7G/D7H | 216 | 19.5 | D150/D155 | 228.6 | 24.5 | |||
D8N/D8K | 228.6 | 22.5 | D355 | 260 | 27.5 |
Products factory
Products show
Products testing
Products packing and shipping
Product detail pictures:
Related Product Guide:
With our superb management, potent technical capability and strict quality command procedure, we go on to provide our shoppers with trustworthy high-quality, reasonable costs and outstanding services. We goal at becoming considered one of your most trustworthy partners and earning your pleasure for 2018 Good Quality Bulldozer Track Link Assembly - 13G-32-00010 D61EX-12 track chain track link dozer undercarriage parts – Globe Truth, The product will supply to all over the world, such as: Mauritius, Brazil, Sheffield, Establish long term and win-win business relationships with all our customers, share the success and enjoy the happiness of spreading our products to the world together. Trust us and you will gain more. Please feel free to contact us for more information, we assure you of our best attention at all times.
By Deborah from Frankfurt - 2018.08.12 12:27
The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
By Riva from Salt Lake City - 2017.11.01 17:04